NICEIC Approved  ·  Part P Registered  ·  OZEV Authorised
EV charging / Cardiff & South Wales

EV Charger Installation Cardiff & South Wales

Home, workplace and fleet charge points, installed, tested and certified. OZEV authorised, with the survey, DNO notification and grant paperwork handled for you.

OZEV authorisedNICEIC approvedFree survey on every install
7kW home EV charger installed on a house wall in Newport
7kW home charger, Newport
Services / 01

Charging Done Properly

Every install starts with a survey of your supply, because your earthing, main fuse and consumer unit decide what's possible.

Circuit01

Home EV Chargers

A 7kW smart charger on your drive or garage wall, installed, tested and registered. We check your supply first, and if it's close to capacity we fit load management so the charger never overloads the house.

  • Supply and earthing survey before we quote
  • Smart charger supplied and fitted
  • Load management where needed
  • DNO notification handled
  • App set-up and a walk-through
Quote for a home charger
Power
7kW single-phase
Smart charging
Required by law on new home chargers
Circuit02

Workplace & Commercial Charging

Charging for staff, visitors and fleets. 22kW units need a three-phase supply, so we check yours, design the layout and load management, and handle any supply upgrade with the DNO.

  • Site survey and load assessment
  • 7kW and 22kW AC charge points
  • Load management across multiple units
  • Access control and payment options
  • Annual inspection and servicing
Quote for workplace charging
Power
Up to 22kW on three-phase
Servicing
Annual inspection and test
Circuit03

Grants for Flats, Rentals & Businesses

Government chargepoint grants have been available for people who rent or live in flats, for landlords, and for businesses through the Workplace Charging Scheme. Schemes and amounts change, so we check what's open and whether you qualify when we quote, and make the claim if you do.

  • Eligibility checked before you commit
  • Claim made by us as the authorised installer
  • Flat owner and renter grants
  • Landlord grants
  • Workplace Charging Scheme
Check grant eligibility
Installer
OZEV authorised
Paperwork
Handled by us
How it works / 02

Survey, Install, Switch On

A charger is only as good as the supply behind it, so the survey comes first, every time.

01

Free survey

We check your supply, earthing, consumer unit and the cable route, and confirm any grant you may be eligible for.

02

Fixed quote

A written price including any supply work, load management and the DNO notification.

03

Install and handover

Fitted, tested and certified, set up in the app, and shown to you before we leave.

What clients say / 03

Read Our Reviews

Live from our Google Business Profile. Every review was left by a real customer, unedited.

Questions / 04

EV Charging Questions

Something we haven't covered? Give us a call or send us the details.

Can I have a charger if I don't have a driveway?

You need off-street parking that you own or have the right to use. A cable can't be run across a public pavement.

Do I need to upgrade my fuse board first?

Not always. Some older boards or supplies need work before a charger can go in. We check on the survey and tell you before we quote.

How long does a home installation take?

A standard home install is usually done in a day once the survey has been carried out.

Does my charger have to be a smart charger?

Yes. Since 30 June 2022, home and workplace charge points sold in Great Britain have had to include smart charging functions.

Next step

Ready to charge at home or at work?

Tell us where the charger's going and what you drive. We'll book a free survey and check any grants you're entitled to.