NICEIC Approved  ·  Part P Registered  ·  OZEV Authorised
Commercial / Cardiff & South Wales

Commercial Electrical Contractors Cardiff & South Wales

Fit-out, testing and maintenance for offices, shops, hospitality and industrial premises. Planned around your trading hours and priced from a survey, not over the phone.

NICEIC approvedOut-of-hours workingFull O&M handover
Photo to come: a recent commercial install
Services / 01

Commercial Electrical Services

From a single distribution board to a full floor fit-out, plus the statutory testing that keeps your building compliant.

Circuit01

Office & Retail Fit-Out

Cat A and Cat B fit-outs for offices, shops and hospitality, planned around your programme and the other trades on site.

  • Distribution boards and sub-mains
  • Small power, floor boxes and trunking
  • Lighting and lighting controls
  • Containment for data cabling
  • Certificates and O&M documents at handover
Quote for a fit-out
Works for
Tenants, landlords and main contractors
Handover
Certificates, test results and O&M
Circuit02

Fixed Wire Testing & EICR

The Electricity at Work Regulations 1989 require installations to be kept safe, and periodic inspection and testing is how you show it. How often depends on the building, from every year for some premises to every five years for offices and shops.

  • Testing out of hours or in phases
  • Boards labelled and circuit charts updated
  • C1, C2, C3 and FI findings explained
  • Remedials priced line by line
  • Next test date scheduled
Quote for testing
Standard
BS 7671, IET Guidance Note 3
Downtime
Kept to the circuit being tested
Circuit03

Emergency Lighting

Design, installation, testing and certification to BS 5266-1. Systems need a monthly function test and a full-duration test once a year, with the results logged.

  • Design and installation
  • Monthly and annual testing
  • Logbook and certificates
  • Self-test and LED upgrades
  • Battery and fitting replacement
Quote for emergency lighting
Standard
BS 5266-1
Testing
Monthly, plus annual full-duration test
Circuit04

Fire Alarm Systems

Installation, servicing and repair of fire detection and alarm systems to BS 5839-1. Systems should be serviced at least every six months, with a weekly user test in between.

  • Conventional and addressable systems
  • Six-monthly servicing
  • Fault finding and repairs
  • Logbook and certification
  • Weekly test guidance for your staff
Quote for a fire alarm
Standard
BS 5839-1
Servicing
At least every six months
Circuit05

Three-Phase Power & LED Upgrades

New three-phase supplies and distribution for machinery, commercial kitchens and EV charging, and LED lighting upgrades that cut running and maintenance costs.

  • Three-phase supplies and distribution
  • Machinery and kitchen supplies
  • LED retrofits for offices, warehouses and car parks
  • Presence and daylight lighting controls
  • Supply upgrades arranged with the DNO
Quote for power or LED
LED upgrades
Lower running and maintenance costs
Supply
DNO applications handled
How it works / 02

Survey, Price, Install, Certify

Planned work with a defined scope and a programme you can hold us to.

01

Survey and scope

We visit, read the drawings and test what is there, then tell you what the job actually involves.

02

Fixed price and programme

Costs broken down by element and a phasing plan that works around occupation or trading hours.

03

Install, test, hand over

Certification, test results and O&M documents, with the next test dates scheduled.

What clients say / 03

Read Our Reviews

Live from our Google Business Profile. Every review was left by a real customer, unedited.

Questions / 04

Commercial Questions

Something we haven't covered? Give us a call or send us the details.

How often does a commercial building need testing?

It depends on how the building is used. IET Guidance Note 3 suggests every five years for offices and shops, every three for industrial premises, and every year for places such as swimming pools and some entertainment venues.

Can testing be done without closing the business?

Yes. We test out of hours or circuit by circuit, so power is only off where we're working.

Do you provide O&M documentation?

Yes. Fit-outs are handed over with certificates, test results and O&M documents.

Do you offer planned maintenance?

Yes. We can schedule your fixed wire testing, emergency lighting and fire alarm servicing so every test date is covered.

Next step

Got a spec, a drawing or a test due?

Send it over. We'll come back within one working day with a view on scope, programme and cost.